CG Common Ground | Shelby
Common Ground data roomCompleted

Carroll Shelby International, Gardena: the mural we painted first

Chief Executive Officer of Tellus Design and Build, the general contractor for Carroll Shelby International's California hub in Gardena, four phases from a mural to the Snake Pit lounge, and the City of Carson exemption in the middle of it; 2013 to 2017

IndustryAutomotive brand and retail
Project typePhased design-build and city entitlement
Dates2013 to 2017
SeatChief Executive Officer
EntityTellus Design and Build

Tellus held two seats in the Shelby relationship: general contractor for Carroll Shelby International's California hub in Gardena, and owner's representative and construction manager for Shelby American's relocation in Las Vegas. Gardena needed a builder who would price one phase at a time and a standing with the city strong enough to carry a bigger project later, which mattered when Carson froze all new construction in 2016. Las Vegas needed someone on the owner's side to buy out the trades, hold the schedule and the cost, and carry the city, without paying for a general contractor's layer of coordination Tellus already did.

In Gardena, Tellus priced the mural alone, painted it first, and let the finished wall make the case to the city; when the freeze came with no exception clause, it brought Carson a packet on what Shelby would add to the city and went in person. In Las Vegas, Tellus ran the relocation owner-held: Shelby contracted each trade directly, Tellus served as owner's representative and construction manager, and Shelby took on, up front, the risks a general contractor would have carried.

The Gardena mural stayed up at the city's own request, the retail store opened, and the Snake Pit lounge was built in two phases inside Carroll Shelby's former apartment, with one of the few exemptions Carson granted during its freeze. The Las Vegas facility opened on schedule in March 2015, with Tellus's own press release putting the saving against the general contractor path at upwards of $300,000.

Problem

A builder who priced the wall and nothing more, so the next phase could be a fresh decision on finished work; and a standing with the city strong enough to carry a bigger project later, which turned out to matter when Carson froze all new construction in 2016.

What we did

Price the mural alone and never propose a program. Paint it first and let the finished wall make the case to the city. When the freeze came with no exception clause, bring the city a packet about what Shelby would add to Carson, with the record behind it, and go in person.

Result

A 15-by-40-foot mural the city said it would never have approved and told us to keep; the retail store open; the Snake Pit lounge built in two phases inside Carroll Shelby's former apartment; one of the few exemptions the city granted during its freeze.

Oftentimes it is better to ask for forgiveness. A finished wall the whole street likes is a better argument than a drawing of one.Jesse Fowler

Inside this room

01

Carroll Shelby International, Gardena

Open
02

Shelby American, Las Vegas

Open

Read on

01

The decision and the reasoning

Why we did it this way, told first.

Read
02

What we did and what it produced

The work, decision by decision, and the result.

Read
03

A slice of the project list

A few related projects.

Read